HI All, I wanted to delete some old backups but the creation date is in hexadecimal format not in more human readable DDMMYY.

I have looked into the config. menu but the setting is already in

DDMMYY.

Is there any way to convert the viewing date of the backups

in the human mode?


Thanks.

Phil

This might be a stupid question, but are you sure you are looking at the "Created" column which shows the creation date, not the "ID" column?

HI thanks for the quick replay.

Below is attached a snap of the backup list.

the last code of the first backup key-row is in the column CREATED : 00027D

I guess it is the date in HEX, even if in the config. menu the setting is in DDMMYY mode.

Any suggestion ?

Phil

---------snap---------------------------

jv16 PowerTools 2006


Data fields are: Descrizione, Tipo, ID, Creati


HKCU\Software\Mic..., HKCU\Software\Mic..., HKCU\Software\Mic..., Entries removed with Registry Finder, 963 B, 000027

{KEY}, {KEY}, {KEY}, {KEY}, {KEY}, {KEY}, {KEY}, {KEY}, {KEY}, {KEY}, {KEY}, g, f, e, d, c, b, j, i, Voci rimosse/Cambiate con Pulitore del Registro, 5,0 KB, 00027D

LastUsedSource, 1, LastUsedSource, 1, ExePath, 0, 1, HRZR_EHACNGU:\G..., HRZR_EHACNGU:\f..., HRZR_EHACNGU:\f..., Voci rimosse/Cambiate con Pulitore del Registro, 15,6 KB, 000286

1, LastUsedSource, 1, LastUsedSource, 1, LastUsedSource, 1, LastUsedSource, 1, LastUsedSource, 1, LastUsedSource, Voci rimosse/Cambiate con Pulitore del Registro, 29,4 KB, 00029C

{KEY}, DisplayName, NoModify, TSAware, UninstallString, {KEY}, DisplayName, DisplayVersion, HelpLink, Voci rimosse/Cambiate con Pulitore del Registro, 8,1 KB, 0006DB

----------------------------------------

Does the date format setting (jv16 PowerTools' settings > Advanced tab) say "DDMMYY"?


Could you try to change that for example to: "DD.MM.YY"? (without the ""s, of course.)

Hi, in the config menu it says: DD.MM.YYYY, HH

All other programs do write well the date.

The only change I have done is the keyboard layout in the numerical pad.

I have substituted the decimal point in a comma with a kbd layout changer.

Because it is easier for me when writing the prices in Euro.

Does it implies any thing with the jv16 program?

If yes I will rechange the kbd layout to normal for a test.

Phil

I have changed the date format in ddmmyyyy and still no luck in the backup

window.

Have tried to do a list in the registry search and the date is changed as I have setted.

Phil

Hello,


In the italian translation I found at least two faults:

1) In line 521 the column: "Size" is missing

- so this column is not shown in the Backuptool-window and ID and Created moved to the left and shows the wrong values of course.

2) in line 443 some of the date/time abbreviations are not as the original once.


Jouni: BTW, the third date/time abbreviation in the original do have "-" instead of "." and there is "," between date and time missing


Jean-Paul

HI Jepe thanks for the replay.

I have switched the language to english and it works.

The DATE now is printed correctly.

Pity for the italian version, maybe in a future revision will be it better!

Well this is another occasion to learn more english language for me.

:

Regards.

Phil

jepe wrote


Jouni: BTW, the third date/time abbreviation in the original do have "-" instead of "." and there is "," between date and time missing

Yes, this is by design. The date format in question is similar to the ISO 8601 date format.

Hello Phil,


If you want you can send me your E-mail address by a private message (PM button) and I will send you a corrected language file - for this problem.

Or I can send you by PM the E-mail address of the italian translator as you can inform him about the problem.


Jean-Paul